三板溪水电站库区柳南公路岩洞湾段改建、展巫段“乃寿老渡口”岸坡治理工程施工招标公告
一、 项目概况
本标内容包含三板溪水电站库区柳南公路岩洞湾段改建、展巫段“乃寿老渡口”岸坡治理两个部分施工。
(一) 柳南公路岩洞湾段改建工程概况
三板溪水电站位于清水江中游,坝址处在贵州省锦屏县境内,上游距剑河县柳川镇value="80" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">80km,下游距锦屏县城value="25" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">25km。工程以发电为主,并兼有防洪、灌溉、旅游、航运等综合效益,为多年调节水库。水库正常蓄水位value="475" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">475.00m,死水位value="425" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">425.00m,正常蓄水位时相应库容37.48亿m3,水库面积value="79.56" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">79.56km2,水库范围涉及到锦屏、剑河以及黎平3个县,20年一遇水库回水至剑河县革东镇五岔村附近,长约value="120" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">120km。
由于三板溪水电站蓄水影响,引起三板溪水电站库区岩洞湾清水江右岸发生大规模山体滑坡,导致柳南公路(柳川至南埃)岩洞湾段公路中断,影响公路沿线乡镇生产生活物资运输和对外交通联系。为恢复交通,必须进行改建。
原柳南公路岩洞湾段从岸坡前缘高程value="506" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">506.00m~value="511" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">511.00m通过,公路以下坡角较陡,原河床高程value="425" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">425.00m左右。岸坡由第四系堆积物组成,公路高程附近水平厚度推测value="10" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">10m~value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20m,组成物主要为泥和块、碎石,结构较松散,工程地质条件较差,在原库水位相对较低时,公路下部岸坡曾出现过垮塌现象。受库水位上升影响,岸坡稳定降低,导致公路以下岸坡出现垮塌,由此引起上部水库岸坡出现滑坡。变形岸坡高程value="425" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">425.00m~value="560" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">560.00m,总高度约value="140" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">140m,其中正常蓄水位以上高度近value="90" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">90m,公路以上高度约value="50" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">50m,沿公路长约value="200" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">200m,公路高程以上滑坡体体积推测1×value="105" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">105m3左右。经设计推荐、主管部门批准,柳南公路岩洞湾段采用隧道方案改线。
隧道起点为K0+100,终点为K0+455,隧道全长value="355" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">355m,隧道进口在东岭信方向,隧道出口在南埃方向。隧道轴线半径为value="250" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">250m,在进口处设置直线段与隧道平曲线相连,在进口过渡段设置长value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20m的缓和曲线与直线段和半径为value="40" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">40m圆曲线相连,在连接段设置value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20m的缓和曲线和直线段与原老公路平顺连接。在出口处设置了直线段与老公路平顺相接。公路等级为山岭重丘区四级公路,设计时速为value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20km/h,设计荷载为公路-Ⅱ级。隧道采用净空为value="9" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">9.0m×value="6.563" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">6.563m的三心直墙式断面。隧道设计建筑限界为value="9" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">9.0m(value="3.5" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">3.5m行车道×2+1.0人行道×2);隧道内路面宽度为value="7" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">7.0m,在两侧设置了value="1" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">1.0m宽人行道,人行道下设value=".35" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">0.35m宽排水沟;隧道纵坡为2.9%。
隧道主要技术指标表
项 目
|
指 标
|
备 注
|
起终桩号
|
K0+000~K0+480.00
|
|
路线长度
|
value="480" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">480.0m
|
隧道位于K0+100~K0+455,长value="355" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">355.0m
|
公路等级
|
四级
|
双车道
|
设计速度
|
value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20km/h
|
|
行车道宽度
|
value="3" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">3.0m×2
|
|
路基宽度
|
value="9" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">9.0m/value="7" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">7.0m
|
进、出洞口过渡段路基与隧道净宽同宽,与老路连接段为value="7" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">7.0m
|
公路圆曲线一般最小半径
|
value="30" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">30m
|
|
公路圆曲线极限最小半径
|
value="15" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">15m
|
|
停车视距
|
value="20" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">20m
|
|
最大纵坡
|
3.0%
|
|
隧道圆曲线最小半径
|
150
|
|
隧道净宽
|
净value="7" hasspace="False" negative="True" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">-7m+2×value="1" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">1.0m人行道
|
双侧设人行道,根据当地挑担行人多,加宽至value="1" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">1.0m
|
隧道净高
|
6.563
|
|
荷载等级
|
公路-Ⅱ级
|
|
(二)柳南公路展巫段“乃寿老渡口”岸坡治理工程概况
柳南公路展巫段(展鲁至巫仰溪)位于剑河县柳川镇三板溪水电站水库右岸,紧临水库,两岸分布有数个村、寨居民点。三板溪水电站自2006年下闸蓄水后,2014年最高水位已基本接近正常蓄水位value="475" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">475.00m,在水库运行过程中,该段部分水库库岸边坡出现变形现象。2015年11月柳南公路“乃寿老渡口”库岸出现滑坡坍岸现象。
“乃寿老渡口”岸坡表部主要由具有一定厚度的第四系崩坡积物组成,其结构松散,稳定性差。由于水库蓄水影响,崩坡积物岸坡稳定减弱,前缘局部已产生坍滑型破坏,随着库水位升降变化、库水浸泡和降雨条件下,公路下部岸坡原坍滑部分发展,从而引起边坡上部岸坡下沉,产生从下往上牵引式逐级变形,造成岸坡变形范围扩大形成滑坡。
“乃寿老渡口”岸坡位于柳川大桥下游value="3.3" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">3.3km~value="3.7" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">3.7km,巫仰溪桥上游value=".4" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">0.4km~value=".8" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">0.8km,柳南公路从岸坡高程value="510" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">510.00m~value="515" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">515.00m通过。
“乃寿老渡口”岸坡工程治理长度value="190" hasspace="False" negative="False" numbertype="1" tcsc="0" w:st="on" xmlns:st1="st1" xmlns:w="w">190m,采用公路内移方案,即把公路路基内移至边坡稳定岩层,边坡按岩层1:0.75坡比,土层1:1.0坡比进行开挖,坡面采用锚杆格构梁加固,坡脚采用护脚挡墙护脚,两端连接路采用路肩挡土墙、排水系统等措施。
现贵州省清水江三板溪水电站库区柳南公路岩洞湾段改建、展巫段“乃寿老渡口”岸坡治理工程已具备施工招标条件,根据《中华人民共和国招标投标法》和项目建设的需要,招标人贵州清水江水电有限公司决定通过公开招标方式选择承包人。
二、 招标范围
本招标项目的招标范围主要包括(但不限于)以下内容:
(一)柳南公路岩洞湾段改建施工
1、隧道进、出口洞脸施工:
(1) 隧道进、出口洞脸土方开挖;
(2) 隧道进、出口洞脸挂网锚喷;
(3) 隧道进、出口洞门钢筋混凝土施工。
2、隧道
(1) 隧道洞身开挖及支护;
(2) 隧道洞身混凝土衬砌;
(3) 隧道衬砌回填灌浆;
(4) 隧道内防、排水系统施工;
(5) 隧道内路面工程施工。
3、 隧道进、出口连接段公路施工
(1) 隧道进、出口连接段公路路基开挖、回填;
(2) 隧道进、出口连接段公路路堤挡土墙施工;
(3) 隧道进、出口连接段公路路面施工;
(4) 隧道进、出口连接段-公路防撞栏等附属设施施工。
4、洞外排水系统
(1) 洞外截、排水沟施工;
(2) 集水井施工;
(3)过路涵管施工。
5、 其他
(1) 隧道照明系统;
(2)交通附属设施。
(二)柳南公路展巫段“乃寿老渡口”岸坡治理施工:
1、边坡工程
(1)边坡土、石方开挖;
(2)锚杆、格构施工;
(3)喷播草籽施工;
(4)护脚墙施工。
2、道路工程
(1)路肩挡土墙施工;
(2)路基路面施工。
3、排水系统
(1)截、排水沟施工;
(2)集水井施工;
(3)过路涵管施工。
4、弃碴场工程
(1)拦碴挡墙施工;
(2)弃碴场排水施工;
(2)弃碴场撒草籽绿化。
三、 资金来源
本招标项目资金来源已落实。
四、 投标人的资格要求
(一) 法人资格:在中华人民共和国工商部门注册、具有独立法人资格和独立订立合同的权利;
(二) 资质等级:具有国家有关部门颁发的公路工程施工总承包二级及以上资质或水利水电工程施工总承包二级及以上资质。
(三) 施工业绩:近三年具有与本招标项目相类似的施工业绩(要求提供业主/用户证明,并附业主/用户联系方式,否则所提供的业绩不予采纳);
(四) 财务状况:近三年财务能力稳定、可靠,流动资金能满足本招标项目施工需要。投标人应提交最近三个会计年度(2014年~2016年)经合法中介机构审计的财务报表(包括资产负债表、现金流量表、损益表)及银行出具的资信证明;
(五) 施工设备:投标人应能保证及时提供本招标项目所需的施工设备,其数量和品种应能满足本招标项目主要的施工作业要求。若中标,拟投入本招标项目的主要施工设备清单中的关键设备和数量应及时到场,并保证完好。
(六) 项目经理:必须与投标人签定正式劳动合同三年以上(提供劳动合同和社保机构盖章的社保证明);持有一级注册建造师证书和安全生产B证;应有10年以上施工经历,近五年内负责过类似于本工程的施工(要求提供业主/用户证明,并附业主/用户联系方式,否则不予采纳),担任过3年以上的项目经理。
项目经理资质证书实行押证管理,中标人从签定合同起须将项目经理资质证书(原件)押在项目业主方保管,至工程竣工验收完成后退还。
(七) 主要人员:主要管理和技术人员应具备相应资质,并至少有1个以上类似工程施工经验;
(八) 其它:投标人应无履行合同和安全文明施工的不良记录,无不良诉讼记录,无在招标投标活动中受到违规处罚的记录。
1. 投标人应具备有效的安全生产许可证,且应通过ISO9000标准认证、ISO14000环境管理体系、OHSAS18000职业健康安全管理体系认证。
2. 投标人应无行贿犯罪记录,并应递交其当地检察机关提供的行贿犯罪档案查询结果证明文件;
3. 投标人应无履行合同和安全文明施工的不良记录,无不良诉讼记录,无在招标投标活动中受到违规处罚的记录。
五、 投标限制
属于下列情况之一的单位不能参与本招标项目的投标:
(一) 为本招标项目的前期准备或者监理工作提供设计、咨询服务的任何法人及其任何附属机构(单位);
(二) 单位负责人为同一人或者存在控股、管理关系的不同单位,不得参加同一标段投标或者未划分标段的同一招标项目投标;
(三) 在国家权威机构或部门信息管理平台【《人民法院公告网》、《中国执行信息公开网》、《全国建筑市场监管与诚信信息发布平台》等】被曝光为失信或存在严重不良行为的单位;
(四) 被责令停业的、或财产被接管或冻结的;
(五) 被暂停或取消投标资格的;
(六) 不接受联合体投标。
六、 工期要求
计划2017年5月开工,至2018年1月底前竣工,总工期270天(具体日期以招标人书面通知为准)。
招标文件将于 2017年4月9日至4月14日上午9点至12点,下午3点至5点出售。招标文件接受面售和网售两种方式。
(一) 面售
投标人须派人持以下证件前来购买:
1. 本单位介绍信或法定代表人授权委托书原件;
2. 营业执照、安全生产许可证、资质证书原件及复印件(加盖单位公章);
3. 经办人身份证原件及复印件、招标文件购买款汇款回单(汇款单上需注明“购买单位名称和招标项目名称”)。
(二) 网售
投标人需向招标人指定邮箱发送投标人如下购买信息:
1. 投标人名称;
2. 本单位资质证书、营业执照、安全生产许可证、介绍信或法定代表人授权委托书等有效证件(扫描件);
3. 投标人详细地址(含邮政编码);
4. 联系人姓名及联系方式(手机号码、办公室电话、传真号码、电子邮箱);
5. 招标文件购买款汇款回单(汇款单上需注明“购买单位名称和招标项目名称”)。
招标人确认招标文件购买款到帐后向投标人指定邮箱发送招标文件电子版,纸质版可在投标时领取。电子版招标文件与纸质招标文件不一致时,以纸质文件为准。
(三) 标书购买费
招标文件(含电子版)每套售价人民币3000元(只接受电子汇款),无论中标与否,此费用一律不退。
网售形式购买的,如需邮寄纸质文件,由投标人在收取招标文件时向快递公司支付邮寄费用。
本招标项目仅供正式会员查看,您的权限不能浏览详细信息,请联系办理会员入网事宜,成为正式会员后可下载详细的招标公告,报名表格,项目附件和部分项目招标文件等。
联系人:马工
手机:18701298819.13691077250
邮箱地址:1051008819@qq.com
相关附件:附件1.公告.docx
附件2.申请登记表.docx